[Back]Home > News

  • Proper way to preserve Spiral Pipe

    Date:2016-02-23      View(s):2475      Tag:spiral welded pipe, spiral welded pipe preservation

    There are seven methods to preserve spiral welded pipe...

  • Process to Spiral Steel Pipe

    Date:2016-02-22      View(s):2448      Tag:spiral steel pipe production process, spiral steel pipe manufacturing process

    Spiral pipe processing means on the basis of the original spiral pipe manufactured in accordance with the requirements of the requirements of the desired product....

  • Welding Technology of LSAW Steel Pipe

    Date:2016-02-21      View(s):2394      Tag:LSAW steel pipe, longitudinal welded pipe, straight seam welded pipe, submerged arc welding

    Molding method for manufacturing large diameter lsaw steel pipe are UOE molding method, a row of roll forming method (CFE), CE molding....

  • Various Influence Factors of Steel Hardenability

    Date:2016-02-20      View(s):2497      Tag:steel hardenability, steel production, steel manufacturing

    There are Various Influence Factors of Steel Hardenability ...

  • Shinestar Holdings Group Recruiting Season in 2016

    Date:2016-02-19      View(s):2621      Tag:company news, company recruitment news, job offering

    Millionaires building plan -- Shinestar Group 2016 recruitment is fervent in undertaking.Apllying with successful person, Companing with finest person Shinestar warmly welcome you! Let's talk, let's change! ...

  • International Shipping Terminology

    Date:2016-02-18      View(s):2407      Tag:internatioanl shipping, internatioanal trading, shipping terminology

    International Shipping Terminology: Ex Works (EXW),Free Carrier (FCA),Carriage Paid To (CPT),Carriage and Insurance Paid To (CIP),Delivered at Terminal (DAT),Delivered at Place (DAP),Delivered Duty Paid (DDP) etc....

  • Pre-welding process for LSAW Steel Pipe

    Date:2016-02-17      View(s):2541      Tag:LSAW steel pipe, steel pipe manufacturing process, pre-welding process for LSAW steel pipe

    LSAW steel pipes (UOE, JCOE) manufacturing processes, welding processes are set to continuous advance. ...

  • Cause Analysis of LSAW Steel Pipe Surface Crack

    Date:2016-02-16      View(s):2549      Tag:lsaw steel pipe, LSAW steel pipe, submerged arc welded steel pipe, straight seam welded pipe, longit

    Cause Analysis of LSAW Steel Pipe Surface Crack....

  • Features of Precision Tubes

    Date:2016-02-15      View(s):2343      Tag:precision tubes, seamless steel tubes, precison seamless steel tubes

    Precision steel tubes is a kind of seamless steel pipe. Precision tubes features:...

  • Heat Treatment Process of LSAW Steel Pipe

    Date:2016-02-14      View(s):2364      Tag:heat treatment process for LSAW steel pipe, LSAW steel pipe production process

    Heat Treatment Process of LSAW Steel Pipe....

  • 2016 New Year Speech by the Chairman of Shinestar

    Date:2016-02-13      View(s):2672      Tag:yearly party for SHINESTAR, annual party for SHINESTAR

    2016 New Year Speech by the Chairman of Shinestar...

  • Steel Pipe Package Requirement

    Date:2016-02-12      View(s):3415      Tag:steel pipe package, steel pipe packing, steel pipe bundling, steel pipe container

    Steel Pipe Package Requirement: 1. bundled package requirements, 2. container package requirement...

  • Chairman Honored as Top Ten Business Leaders

    Date:2016-02-11      View(s):2532      Tag:HUNAN PRIME STEEL PIPE CO., LTD, SHINESTAR HOLDINGS GROUP

    On January 14~16,2016 Chinese economic reform and development forum was held in Beijing. After strict review, our chairman YIGUOYU Honored as Top Ten Business Leaders of Chinese Economic Construction. ...

  • The comparison between frame scaffolding and tubular scaffolding.

    Date:2016-02-10      View(s):2744      Tag:tubular scaffolding, scaffolding pipe, scaffolding tube

    The comparison between frame scaffolding and tubular scaffolding....

  • What are the working process for the erection of the scaffolding?

    Date:2016-02-09      View(s):2536      Tag:scaffolding tubes, scaffolding pipes, pipe scaffold, pipe scaffolding

    When building the scaffolding frames, the ground shall be leveled and solid and the bottom of the standing tubes shall be backed with a thick scaffolding plank about 50mm in depth. There shall be a 50mm thick scaffolding for sale plank or 15 mm plywood on the floor....

Page:  1 ... 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 ... 144
Products Category