LSAW steel pipes (UOE, JCOE) manufacturing processes, welding processes are set to continuous advance. Its role is to be finalized after the tube forming, shaping and positioning within the weld seam on the back cover, in order to ensure the pipe dimensions and is conducive to tube welded pipe to improve quality and production efficiency.
After forming the tube by the next roller conveyor transported to a pre-welder's torch, rising rotating roll, rotate to adjust an open position to weld at the top of both sides of the pressure on the pressure roller and the pressure roller so that the tube seam, drop gun and adjust the tracking of the weld seam, open the protective gas and cooling water, start welding, welding condition monitoring, welded to the tube end welding arc stops (automatic delay stop gas), lift the gun and the top pressure rollers, pipe welder pre sent , pipe ends and welding defects.