[Back]Home > News > Pipe Production

Double-sided Submerged Arc Welding Straight Seam Steel Pipe Welding Area
Date:2017-03-14      View(s):1911      Tag:steel pipe, submerged arc welding straight seam steel pipe

Submerged arc welding straight seam steel pipe welding introduction:


1, The bubble occurred in the middle of the weld, the main reason is that hydrogen is still in the form of bubbles hidden in the weld metal inside, so the elimination of this defect is the first step must be removed welding wire and weld rust, oil, moisture and Moisture and other substances, followed by the need to dry the flux to remove moisture. In addition, to increase the current, reduce the welding speed, slow down the melting rate of molten metal is also very effective.


2, Sulfur crack (sulfur caused by the crack). A crack in the sulfur segregation zone in the weld segregated zone, especially in soft boiled steel. The reason for this is that there is hydrogen present in the sulfur segregation zone containing low melting point iron and steel. Therefore, in order to prevent this situation, the use of sulfur segregation with less semi-killed steel or sedative steel is also effective. Second, the weld surface and flux cleaning and drying is also necessary.
Products Category