1. The stacking principle requirements of SSAW steel pipe is stable and ensuring the safety, so we should stacking SSAW steel pipe according to specifications, different varieties, different materials, and different specifications SSAW steel pipe should be stacking respectively, to prevent muddy and mutual erosion.
2. SSAW steel pipe is prohibited in the steel pipe stacking around the location of the erosion of steel pipe objects.
3. SSAW steel pipe bottom should be high, strong, smooth, to prevent the material damp or deformation.
4. The same kind of material SSAW steel pipe should be stacking in accordance with the order of storage in order to facilitate the implementation of the principle of improving the predecessors.
5. If the SSAW steel pipe in the open space, must be under the spiral pipe to prevent the wooden mat or stone, etc., and the stack should be slightly inclined to facilitate drainage, and pay attention to whether the steel pipe is straight to prevent bending deformation of steel.
6. The height of the SSAW steel pipe stacking, manual work of not more than 1.2m, mechanical homework of not more than 1.5m, stacking width of not more than 2.5m.
7. SSAW steel pipe between the stacking and stacking should leave a certain channel, check the width of the road is generally about 0.5m, the width of the access channel according to the size of the material and transport machinery may be, generally 1.5 to 2m.
8. The height of the SSAW steel pipe bottom height According to the specific circumstances, if the warehouse for the sun to the cement floor, the height of the pad can be 0.1m, if the mud, the pad should be 0.2 to 0.5m. If stored in the open air, cement floor mat should be 0.3 to 0.5m or so, the ground floor pad should be in the 0.5 to 0.7m.