[Back]Home > Price > SAW Steel Pipe Price

LSAW Steel Pipe Price Jul 5 - Jul 11, 2017
Date:2017-07-05      View(s):1196      Tag:lsaw pipe price, lsaw steel pipe price, in stock lsaw pipe price
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
FOB TIANJIN Outside Diameter 外径 (mm)
USD/TON 406 457 508 609.6 711.1 762 812 863.6
Wall  8 637  637  643  630  630  625  630  630 
Thickness  9.53 605  624  630  611  611  606  611  611 
壁厚 (mm) 10 605  592  598  611  611  606  611  611 
12 605  592  598  611  611  606  611  611 
14 605  592  598  611  611  606  611  611 
16 605  605  611  598  598  593  598  598 
18 / 605  611  598  598  593  598  598 
20 / / 611  598  598  593  598  598 
22 / / 611  598  598  593  598  598 
24 / / 611  598  598  593  598  598 
26 / / / 611  598  593  598  598 
28 / / / / 598  593  598  598 
30 / / / / 598  593  598  598 
32 / / / / 611  606  611  611 
34 / / / / / / 611  611 
36 / / / / / / 611  611 
38 / / / / / / / /
40 / / / / / / / /
FOB TIANJIN Outside Diameter 外径 (mm)
USD/TON 914 1016 1066.7 1117.6 1219.2 1320.8 1422.4 /
Wall  8 630  630  637  637  / / / /
Thickness  9.53 630  630  630  630  630  676  663  /
壁厚 (mm) 10 611  611  618  618  618  688  688  /
12 611  611  605  605  605  637  688  /
14 611  611  605  605  605  637  688  /
16 598  618  605  605  605  637  682  /
18 598  618  605  605  605  637  682  /
20 598  618  605  605  605  637  682  /
22 598  618  605  605  605  637  682  /
24 598  618  605  605  605  637  682  /
26 598  618  605  605  605  637  682  /
28 585  605  592  592  592  637  682  /
30 585  605  618  618  618  637  682  /
32 598  618  618  618  618  650  688  /
34 598  618  624  624  624  650  688  /
36 598  618  624  624  624  650  688  /
38 598  618  624  624  624  650  688  /
40 / / / / / 650  688  /
   Note: 
1. The above price is based on BARE pipe, for extra coating, please contact sales@primesteeltube.com;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@primesteeltube.com;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
 4. The above price is only valide during July 5 -July 11;
 5. The applicapable MOQ for this price list is over 25 tons;
Products Category